Walkway completed for Philip Morant School.

Our second summer of collaboration with Philip Morant School has seen Fordingbridge install a 98m long walkway in addition to the 715m² atrium canopy designed and built last summer. The steel mono pitch flat design will protect staff and students from the weather when walking between buildings.

The CE marked steel structure was fabricated at our very own factory site in Arundel. The structure was finished with toughened glass along one side and powder coated in RAL 6016 to match the schools branding.

Style: Mono pitch flat design

Frame: Steel box hoop

Length: 98m

Colour: Polyester powder coated steel frame to match existing finishes – steel frames can also be hot-dip galvanised for minimum maintenance

Roof: Hard-wearing translucent 16mm triple walled polycarbonate. This covering has a guarantee of 15 years is fire retardant and gives high UV protection.

Gutters and rain pipes: Powder coated aluminium gutters and rainwater pipes to match existing structure

loading ...

Philip Morant School Phase 2 steel walkway by Fordingbridge
Philip Morant School Phase 2 steel walkway by Fordingbridge
Philip Morant School Phase 2 steel walkway by Fordingbridge
Philip Morant School Phase 2 steel walkway by Fordingbridge

Industry leading guarantees